Case Studies
πΊπΈ USA β Site Readiness
Infrastructure groundwork for a new biomass facility in the southeastern U.S.
πΈπΏ Swaziland β Plantation Harvesting
High-efficiency eucalyptus harvesting with minimal soil impact in Swaziland.
π¨π² Cameroon β In-Field Tree Chipping
Rubber tree end-of-life cycle chipping and biomass conversion in Cameroon.
π¦πΊ Western Australia β On-Site Chipping
Remote-area woodchipping operations near Port Albany.
πΏπ¦ South Africa β Chipper Trials
Live testing of a high-throughput chipper with invasive eucalyptus trunks.
πͺπΈ Spain β Roadside Chipping
Fast turnaround pine chipping operations into waiting articulated trucks.
π¨π² Cameroon β Port Loading (Kribi)
Bulk vessel loading via front-loaders and conveyorsβ30,000 tonnes to Europe.